You don't have javascript enabled. Good luck with that.
Pencarian
Arus Mudik Dimukai, Pemasangan Lampu PJU di Kalimalang Dikebut

LED Lamp Installation Along Jl Kalimalang Accelerated

Approaching homecoming season, the street light installation keeps being accelerated along Jl Kalimalang, East Jakarta. 

It is targeted to be complete today by installing 56 lamps. Considering homecoming flow will begin this week

Jakarta Industry and Energy Dept Head, Yuli Hartono disclosed street light type light emitting diode (LED) on Jl Kalimalang is targeted to reach 56 units. Those are installed from junction of Jl Raden Inten until Caman which borders with Bekasi.

"It is targeted to be complete today by installing 56 lamps. Considering homecoming flow will begin this week," he stated, when being met at Jl Kalimalang, Monday (6/27).

2,610 LED Lamps Installed in South Jakarta

She explains, each lamp has 90 watts power. They also have been equipped with time switch technology that will turn off automatically at noon.

At the same place, Head of East Jakarta Industry and Energy Sub-dept, Nurhidayat added has coordinated with PT Wika as a contractor of Bekasi Cawang Kampung Melayu Flyover. They were asked to install spotlight along Jl Kalimalang for optimizing the lighting.

Linked News
Popular News indeks
  1. Pramono Affirms Commitment to Enhancing Regional Financial Management Quality

    access_time02-04-2026 remove_red_eye809 personTiyo Surya Sakti
  2. Kampung Rambutan Terminal Sees Increase in Intercity Bus Passengers

    access_time03-04-2026 remove_red_eye708 personNurito
  3. Pramono Calls for Enhanced Synergy at DPRD Post-Eid Gathering

    access_time30-03-2026 remove_red_eye708 personDessy Suciati
  4. Banners Prohibiting Illegal Parking Levies Installed at Blok M Square

    access_time02-04-2026 remove_red_eye646 personTiyo Surya Sakti
  5. Gov Pramono: Jakarta Prepared to Adopt Weekly WFH Scheme

    access_time30-03-2026 remove_red_eye452 personDessy Suciati