You don't have javascript enabled. Good luck with that.
Pencarian
Arus Mudik Dimukai, Pemasangan Lampu PJU di Kalimalang Dikebut

LED Lamp Installation Along Jl Kalimalang Accelerated

Approaching homecoming season, the street light installation keeps being accelerated along Jl Kalimalang, East Jakarta. 

It is targeted to be complete today by installing 56 lamps. Considering homecoming flow will begin this week

Jakarta Industry and Energy Dept Head, Yuli Hartono disclosed street light type light emitting diode (LED) on Jl Kalimalang is targeted to reach 56 units. Those are installed from junction of Jl Raden Inten until Caman which borders with Bekasi.

"It is targeted to be complete today by installing 56 lamps. Considering homecoming flow will begin this week," he stated, when being met at Jl Kalimalang, Monday (6/27).

2,610 LED Lamps Installed in South Jakarta

She explains, each lamp has 90 watts power. They also have been equipped with time switch technology that will turn off automatically at noon.

At the same place, Head of East Jakarta Industry and Energy Sub-dept, Nurhidayat added has coordinated with PT Wika as a contractor of Bekasi Cawang Kampung Melayu Flyover. They were asked to install spotlight along Jl Kalimalang for optimizing the lighting.

Linked News
Popular News indeks
  1. Water Channel on Jalan SPG 7 Being Improved

    access_time18-09-2026 remove_red_eye836 personNurito
  2. Jakarta Pushes to Strengthen Food Ecosystem

    access_time18-09-2026 remove_red_eye614 personAldi Geri Lumban Tobing
  3. Pramono Departs for New York to Discuss Climate and Food Crises

    access_time18-09-2026 remove_red_eye581 personDessy Suciati
  4. Operations of the MV Doulos Hope Ship Library Delayed

    access_time18-09-2026 remove_red_eye563 personAnita Karyati
  5. Sumenep Park Revitalization to Be Aligned with Gresik River Flow

    access_time18-09-2026 remove_red_eye463 personFolmer